Construction project prepared for concrete work
Photo: Josue Isai Ramos Figueroa/Unsplash.

Convert slab dimensions into cubic feet, cubic yards, 80-pound bags, and an adjustable ready-mix material estimate.

Concrete project inputs

feet
feet
inches
%
$ per cubic yard

How this calculator works

Volume = length × width × depth. Cubic yards = cubic feet ÷ 27. An 80-lb bag is estimated to yield 0.60 cubic feet.

How the estimate works: The calculator uses your measurements, unit conversions, waste allowance, and product coverage to create a planning quantity. Review the formula shown above, then read the matching guide below before ordering. See How Our Calculators Work for assumptions and limitations.

Recommended concrete tools and supplies

Affiliate disclosure: As an Amazon Associate I earn from qualifying purchases.

These practical options match the work estimated by this calculator. Verify compatibility, specifications, and the current price before purchasing.

View optional tools and supplies

Concrete mixing tubs

A sturdy tub provides a controlled place to mix smaller bagged-concrete batches.

Check options on Amazon

Portable concrete mixers

Useful for projects requiring multiple consistent batches of bagged mix.

Check options on Amazon

Concrete finishing sets

Trowels, edgers, and floats help shape and finish slabs and repairs.

Check options on Amazon

Concrete safety gear

Look for eye protection, suitable gloves, boots, and properly rated respiratory protection.

Check options on Amazon

Wet concrete can cause burns and dry mix creates harmful dust. Follow the product label and use appropriate gloves, eye protection, and respiratory protection. Read our advertising disclosure.

Concrete quantity basics

Concrete is ordered by volume. Enter the finished length, width, and depth of a rectangular slab. The calculator adds your selected waste allowance and converts the result to cubic yards. Bag yield varies by brand and mix, so verify the number printed on the bag.

Important project checks

Concrete slab example

A 10-by-12-foot slab at 4 inches thick contains 40 cubic feet of concrete. Dividing by 27 gives about 1.48 cubic yards. With a 10% allowance for grade variation, spillage, and uneven forms, the planning quantity becomes about 1.63 cubic yards. A ready-mix supplier may apply an order increment, delivery minimum, or short-load fee, so confirm how the final quantity must be rounded.

Separate every change in depth

Calculate thickened edges, footings, steps, piers, and sloped sections independently, then add the volumes. Use finished dimensions only after confirming excavation, compacted base, form placement, reinforcement, drainage, and local requirements. Bag yield varies by product and jobsite conditions; use the yield printed on the selected bag rather than assuming every 80-pound mix produces the same volume.